Chapter 9

Additional Requirements for Each Purpose Group

Chapter 9 sets out purpose-group-specific fire safety requirements that supplement the general provisions in Chapters 1–8. Each clause addresses the unique risks, occupancy patterns, and structural characteristics of one of the nine Purpose Groups (I–VIII plus Others). Requirements range from simplified exit provisions for small houses (PG I) to detailed compartmentation, smoke-control, and sprinkler thresholds for hospitals, factories, warehouses, and assembly buildings. Clause 9.9 covers special building types including conservation shophouses, buildings under construction, engineered timber structures, mega underground developments, and flammable refrigerant restrictions.

Scope: All buildings in Singapore classified under Purpose Groups I through VIII and special building types covered by Clause 9.9. Requirements supplement and, where they conflict with, take precedence over Chapters 1–8.

Source: SCDF Code of Practice for Fire Precautions in Buildings 2023. This is a guidance summary — always verify against the full Fire Code clause text.

Critical points

  • Storage areas exceeding 100 m² (aggregate) in a non-sprinkler-protected factory must either comply with PG VIII warehouse requirements or be compartmented to keep storage ≤100 m². Sprinkler protection raises this to 700 m².

    CriticalCl.9.6.1c
  • Fire compartmentation between individual tenancy units in terraced/flatted factory buildings is mandatory: walls and floors with ≥1-hr FRR for the entire unit enclosure.

    CriticalCl.9.6.1b
  • Petroleum service stations: boundary of station must be ≥50 m from residential buildings or ≥90 m from places of public assembly. All tanks must be installed underground with individual capacity ≤30 kl.

    CriticalCl.9.6.2a–b
  • EV charging stations at petrol stations: ≥12 m from refilling points/vent pipes, ≥6 m from oil tanker parking, ≥8 m from fuel dispensers; emergency isolation switch within 15 m of each EV charger, at 800–1200 mm above floor level.

    CriticalCl.9.6.2v.(2)
  • BSL-3/BSL-4 high containment facilities: fire compartment ≥1-hr (sprinkler-protected) or ≥2-hr (non-sprinkler); must be at ground floor; firefighter staging lobby required at each entrance with ≥6 m² free space.

    CriticalCl.9.6.3b–d
  • Mezzanine floors in factories: single open staircase permitted if aggregate mezzanine AFA per unit ≤60 m², stair width ≥1 m non-combustible, habitable height ≤24 m, and mezzanine used only for store/ancillary office.

    ImportantCl.9.6.1a.(2)

Compliance thresholds

ParameterValueConditionClause
Max AFA for single-staircase aboveground factory floor200 m²Single exit staircase, aboveground factory floorCl.9.6.1a.(1)(c)
Max aggregate mezzanine AFA per unit (single open staircase)60 m²Mezzanine floor within factory unitCl.9.6.1a.(2)(a)
Max mezzanine habitable height (single open staircase)24 mMezzanine floor within factoryCl.9.6.1a.(2)(e)
Storage area trigger (non-sprinkler factory) — comply with PG VIII or compartment100 m²Non-sprinkler-protected factoryCl.9.6.1c.(1)
Storage area trigger (sprinkler-protected factory)700 m²Sprinkler-protected factory; if exceeded, comply with PG VIII warehouse requirementsCl.9.6.1c.(2)
Min separation — service station boundary from residential buildings50 mPetroleum service stationCl.9.6.2a.(2)
Min separation — service station boundary from places of public assembly90 mPetroleum service stationCl.9.6.2a.(2)
Max underground tank capacity per tank30 klPetroleum service station underground tanksCl.9.6.2b.(2)
Max convenience store size integrated with petrol station150 m²Convenience store within petroleum service stationCl.9.6.2a.(5)
Farm building max habitable height (special requirements apply)10 mFarm buildings qualifying for Cl.9.6.4 requirementsCl.9.6.4a.(1)
Farm building max FLED (fire load energy density)200 MJ/m²Compartment used solely for farmingCl.9.6.4a.(4)
Farm building max compartment AFA8000 m²Farm building farming compartmentCl.9.6.4b.(5)
Min separation — EV charger to fuel dispensing unit8 mEV charging station at petrol stationCl.9.6.2v.(2)(e)
Underground transformer room max AFA250 m²Underground electrical transformer roomCl.9.6.7b.(1)(a)
Underground transformer room max depth9 m below grade, max 1 level below gradeUnderground electrical transformer roomCl.9.6.7b.(1)(b)

Interactive decision tree

Start

Is this a general factory/industrial unit or a specialist PG VI sub-type?