Chapter 3

Structural Fire Precautions

Chapter 3 sets out requirements to prevent fire spreading between adjoining buildings, ensure structural stability during fire, and limit fire spread within a building through compartmentation. It specifies fire resistance ratings for structural elements by purpose group and building dimensions, governs the design of compartment walls and floors, protected shafts, external walls, and fire-stopping. It also regulates surface spread of flame for internal finishes and roof coverings, and prescribes material standards for construction elements.

Scope: All buildings covered by the SCDF Fire Code unless otherwise exempted; specific provisions vary by Purpose Group (PG I–VIII), building height, floor area, cubical extent, sprinkler protection status, and location relative to lot boundaries.

Source: SCDF Code of Practice for Fire Precautions in Buildings 2023. This is a guidance summary — always verify against the full Fire Code clause text.

Critical points

  • Cavity barriers must provide at least ½-hr fire resistance and must extend the full cavity to close edges of cavities and sub-divide them at compartment/separating wall/floor junctions.

    CriticalCl.3.11.3, Cl.3.11.5
  • Exit passageways, smoke-free lobbies, fire lift lobbies, and exit staircases: suspended ceiling over these areas must have non-combustible supporting elements and ceiling, and exposed surfaces must be Class 0 flame spread. Cavity barriers cannot be omitted here even in sprinkler-protected buildings.

    CriticalCl.3.11.11
  • Raised floors: concealed space must not be used for storage; supporting structure must be non-combustible with melting point ≥750°C; maximum unobstructed area in the concealed space must not exceed 930 m² (cavity barriers required).

    ImportantCl.3.11.8
  • For non-sprinkler buildings: if raised floor cavity height exceeds 150 mm, an automatic smoke detection system (SS 645) is required. For sprinkler buildings: detection required if 150–400 mm; sprinkler required if >400 mm.

    ImportantCl.3.11.8k
  • Fire-stopping materials must have the necessary fire resistance when tested to BS 476: Part 20; all gaps around pipe/duct/conduit/cable penetrations in compartment elements must be filled with approved fire-stopping material.

    CriticalCl.3.12.1, Cl.3.12.2
  • PG I buildings and residential units in PG II buildings are exempt from cavity barrier requirements in concealed floor and ceiling spaces.

    NoteCl.3.11.12

Compliance thresholds

ParameterValueConditionClause
Maximum cavity dimension — between roof and ceiling (PG I & II)No limitCavity between roof and ceiling in PG I or II buildingsTable 3.11A
Maximum cavity dimension — between roof and ceiling (other PGs)20 mCavity between roof and ceiling in any PG other than I or IITable 3.11A
Maximum cavity dimension — any other cavity with Class 0 surface exposed20 mAny cavity other than roof/ceiling cavity where exposed surfaces are Class 0Table 3.11A
Maximum cavity dimension — any other cavity with non-Class 0 surface8 mAny cavity other than roof/ceiling cavity where exposed surfaces are not Class 0Table 3.11A
Cavity barrier minimum fire resistance½ hrAll cavity barriersCl.3.11.5a
Maximum unobstructed area in raised floor concealed space requiring cavity barriers930 m²Raised floors with or without accessible panels (non-sprinkler protected)Cl.3.11.8i
Raised floor cavity height triggering smoke detection (non-sprinkler building)> 150 mmNon-sprinkler-protected building raised floor cavity height exceeding 150 mmCl.3.11.8k
Raised floor cavity height triggering automatic sprinkler (sprinkler building)> 400 mmSprinkler-protected building raised floor cavity height exceeding 400 mmCl.3.11.8k
Suspended ceiling cavity exempt from cavity barriers (detector-protected building, no detection in cavity)≤ 800 mm depthDetector-protected building, suspended ceiling cavity depth does not exceed 800 mmCl.3.11.9d
Suspended ceiling cavity exempt from cavity barriers (sprinkler-protected, no combustibles)≤ 800 mm depthSprinkler-protected building, concealed space 400–800 mm deep with no combustible materialsCl.3.11.9e

Interactive decision tree

Start

Cavity Barrier and Fire-Stopping Requirement Check